¡¡
  Automotive Industrial Pipe Clear Parts Double shots Die Casting Assembly
¡¡
¡¡
¡¡
¡¡
AIP Quality
AIP staff firmly believe that the good quality is the fundamental of a corporation' survival. We have consummate quality controlling system, ISO and environment management, experienced and trained employees, advanced machining, inspecting facilities, regular suppliers, to make sure you can trace the whole process of every single part's, from designing to delivery. We have qualified engineers to carry out the mould design, and experts to inspect the feasibility, meanwhile, we are following the American and European design standard, to ensure the design approval. All positions require qualification certificate. All moulds are completed through advance machining equipment in machining center, EDM, W-EDM, etc. At the same time, every process needs to be check over, to ensure an efficient machining.


MAIN QC PROCEDURE

1.Mould Design Control
2.Mould Steel Hardness Inspection
3.Mould Electrodes Inspection
4.Mould Core and Cavity Steel Dimension Inspection
5.Mould Pre-Assembly Inspection
6.Mould Trial Report and Samples Inspection
7.Pre-Shipment Final Inspection
8.Export Product Package Inspection

¡¡
¡¡

2004-2010 © Copyright AIP Plastic&Hardwares CO. Limited . All rights reserved.
Tel: +86-769£­81888210  FAX: +86-769-81888201  E-Mail: Sales2@aip-mould.com   Design by: Salin World